# IT metrics: definitions and formulas read the same way across the company

> 38 IT metrics with formula, unit and interpretation, organised by the eight fields of IT. From the run to change ratio through first contact resolution to recovery time and data quality.

URL: https://techport.ai/en/it-beratung/kennzahlen

---

1.  [IT Consulting](/en/it-beratung)/
2.  IT metrics

Knowledge

# IT metrics

By Redaktion techport.ai, IT-Beratung · Last updated on 21 August 2026

A metric is only a metric if it is calculated the same way in every area. An availability figure that IT measures as server uptime and sales measures as the ability to enter an order is not a metric but an argument. This collection contains the metrics we work with in projects, with formula, unit and an interpretation that says what the value means and what it does not.

It is intended as a reference: adopt the definitions in your systems and every analysis starts with the substance rather than with the arithmetic. We deliberately give target values only as orientation, because they depend on industry, size and operating model.

[IT Strategy and Steering](#kpi-it-strategie-und-steuerung)[Architecture and Applications](#kpi-architektur-und-anwendungen)[Build and Buy](#kpi-entwickeln-und-beschaffen)[Rollout and Change](#kpi-einfuehren-und-veraendern)[Operations and Support](#kpi-betrieb-und-support)[Data and Information](#kpi-daten-und-information)[Security and Resilience](#kpi-sicherheit-und-resilienz)[IT Governance and Compliance](#kpi-it-governance-und-recht)

## IT Strategy and Steering

[Go to the field](/en/it-beratung/it-strategie-und-steuerung)

### Run share of IT cost

Formula

Cost of maintaining current operations divided by total IT cost, times 100

Unit

Percent

Interpretation

The most important steering figure in IT. It shows how much room for change is left at all. Values above 80 percent mean that without additional budget nothing new can happen.

### IT cost per workplace

Formula

Total annual IT cost divided by the number of equipped workplaces

Unit

Euro per year

Interpretation

Only meaningful over time and within the same industry. A low value can mean efficiency or underinvestment, so always read it together with incident and security metrics.

### IT cost as a share of revenue

Formula

Total IT cost divided by revenue, times 100

Unit

Percent

Interpretation

The metric that connects IT with the language of management. The spread between industries is wider than within one, so assess it only against your own trend.

### Completion rate of initiatives

Formula

Number of initiatives completed in the year divided by the number of initiatives active in the year, times 100

Unit

Percent

Interpretation

Shows whether too many initiatives run at once. A low value alongside high activity is the classic sign of missing prioritisation.

### Schedule adherence in initiatives

Formula

Number of initiatives completed within 10 percent of the planned date divided by the number of completed initiatives, times 100

Unit

Percent

Interpretation

Measures planning quality, not speed. Persistently low values usually point to over-optimistic capacity assumptions rather than to poor work.

## Architecture and Applications

[Go to the field](/en/it-beratung/architektur-und-anwendungen)

### Number of active applications

Formula

Number of applications with at least one active user in the last 90 days

Unit

Count

Interpretation

A base figure for cost, security and effort. A rise without corresponding benefit is a warning sign, as is a large gap to the number of applications being paid for.

### Share of applications without vendor support

Formula

Number of applications receiving no security updates divided by the number of active applications, times 100

Unit

Percent

Interpretation

A direct risk metric. Every one of these applications needs a dated retirement plan or a documented decision to accept the risk.

### Share of applications with a named owner

Formula

Number of applications with a business owner divided by the number of active applications, times 100

Unit

Percent

Interpretation

Applications without an owner are typically the worst maintained and the hardest to retire. Values below 80 percent indicate a gap in responsibility.

### Number of productive interfaces

Formula

Number of actively operated data connections between systems

Unit

Count

Interpretation

If this number grows faster than the number of applications, you get a landscape whose change effort rises disproportionately. From roughly ten to fifteen connections, a central integration solution is worth examining.

## Build and Buy

[Go to the field](/en/it-beratung/entwickeln-und-beschaffen)

### Time to system decision

Formula

Calendar days from approval of the selection initiative to the documented decision

Unit

Days

Interpretation

For departmental systems in the mid-market, 60 to 90 days is usual, considerably more for an ERP. Very short values usually mean the requirements phase was skipped.

### Requirements coverage

Formula

Number of must requirements met divided by the number of must requirements, times 100

Unit

Percent

Interpretation

The basis for scoring in a vendor comparison. Only reliable if every vendor worked through the same script with the same data.

### Share of approved tools

Formula

Number of tools introduced through the approval route divided by the number of all newly introduced tools, times 100

Unit

Percent

Interpretation

Indirectly measures how attractive your approval procedure is. A low value does not mean rule breaking but that the official route is too slow.

### Turnaround time for an approval request

Formula

Calendar days from a department's request to the decision, on average

Unit

Days

Interpretation

The most effective lever against shadow IT. Beyond ten days, departments reliably take their own route.

## Rollout and Change

[Go to the field](/en/it-beratung/einfuehren-und-veraendern)

### Adoption rate after introduction

Formula

Number of active users in the new system divided by the number of intended users, times 100

Unit

Percent

Interpretation

The only metric that shows whether an introduction succeeded. Measure 30 and 90 days after go-live, separated by role and area.

### Migration deviation

Formula

Number of deviating records in the reconciliation after migration divided by the number of migrated records, times 100

Unit

Percent

Interpretation

Defined as an acceptance criterion before the switch. Deviations have to be assessed per object, because a wrong stock quantity weighs more than a missing note.

### Change success rate

Formula

Number of changes without an incident or rollback divided by the number of changes carried out, times 100

Unit

Percent

Interpretation

Measures the quality of the change procedure. Values below 90 percent point to a missing test environment or to change packages that are too large.

### Share of incidents caused by changes

Formula

Number of incidents caused by a change divided by the number of all incidents, times 100

Unit

Percent

Interpretation

Connects operations and projects. A high value is not an argument against changes but for testing, smaller packages and agreed windows.

## Operations and Support

[Go to the field](/en/it-beratung/betrieb-und-support)

### Requests per workplace per month

Formula

Number of recorded support requests per month divided by the number of workplaces

Unit

Count

Interpretation

A base figure for staffing support. A sudden rise almost always points to a change, a persistently high value to unresolved causes.

### First contact resolution rate

Formula

Number of requests resolved at first contact divided by the number of all requests, times 100

Unit

Percent

Interpretation

Measures knowledge and permissions at first contact. It rises reliably once a knowledge base built from real cases is maintained.

### Average resolution time by priority

Formula

Sum of handling times per priority level divided by the number of resolved requests at that level

Unit

Hours

Interpretation

Only meaningful separated by priority. An average across all requests hides exactly the cases that matter.

### Availability of critical workflows

Formula

Time during which a critical workflow was usable divided by the agreed service time, times 100

Unit

Percent

Interpretation

Measure from the department's point of view, not the server's. A running server with no way to enter an order is an outage.

### Time to detect an incident

Formula

Time from the occurrence of an incident to its detection, on average

Unit

Minutes

Interpretation

A direct measure of how effective monitoring is. If this value matches the time to the first phone call, the monitoring is not working.

### Share of devices on the standard build

Formula

Number of devices on a defined standard configuration divided by the number of all managed devices, times 100

Unit

Percent

Interpretation

Determines the effort for updates and incidents more than the number of devices does. Values below 80 percent turn every mass change into a project.

## Data and Information

[Go to the field](/en/it-beratung/daten-und-information)

### Duplicate rate

Formula

Number of records identified as duplicates divided by the number of active records, times 100

Unit

Percent

Interpretation

Measure separately per object, typically for customers, suppliers and articles. Values above 5 percent noticeably distort analyses.

### Completeness of mandatory fields

Formula

Number of active records with all mandatory fields filled divided by the number of active records, times 100

Unit

Percent

Interpretation

Placeholders count as not filled. A low value usually indicates that a field is required at the wrong point in the workflow.

### Share of automated reports

Formula

Number of reports produced without manual steps divided by the number of regular reports, times 100

Unit

Percent

Interpretation

Measures the hidden effort in reporting. Every manual step is a source of error and a cover risk.

### Effort for the monthly reporting cycle

Formula

Sum of person hours of all contributors for producing the monthly reports

Unit

Hours per month

Interpretation

The figure that makes the business case for reporting. It is regularly underestimated because the effort is spread across several areas.

### Share of classified documents

Formula

Number of documents with an assigned document type and retention period divided by the number of stored documents, times 100

Unit

Percent

Interpretation

A precondition for deletion and for findable filing. Without classification, everything gets kept indefinitely in case of doubt.

## Security and Resilience

[Go to the field](/en/it-beratung/sicherheit-und-resilienz)

### Recovery time

Formula

Measured time from the decision to recover to usability of the system in a test

Unit

Hours

Interpretation

Only reliable if measured in a test rather than estimated. It is the basis of every emergency plan and almost always turns out longer in the first exercise.

### Success rate of recovery tests

Formula

Number of successful recovery tests divided by the number of tests carried out, times 100

Unit

Percent

Interpretation

The actual evidence that your backup works. A backup run with a success message does not replace this test.

### Multi-factor authentication coverage

Formula

Number of accounts with active multi-factor authentication divided by the number of accounts for which it is intended, times 100

Unit

Percent

Interpretation

For anything reachable from outside and for administrator accounts the value should be 100 percent. Every exception needs a documented justification.

### Time to deploy critical security updates

Formula

Calendar days from publication to installation, on average per criticality level

Unit

Days

Interpretation

One of the most informative security metrics of all, because attacks predominantly exploit known and unpatched vulnerabilities.

### Reporting rate for suspicious messages

Formula

Number of suspicious messages reported divided by the number of test messages sent, times 100

Unit

Percent

Interpretation

More important than the click rate. A high reporting rate with a moderate click rate is better than a low click rate with no reports at all.

### Share of orphaned accounts

Formula

Number of active accounts with no assigned employee divided by the number of active accounts, times 100

Unit

Percent

Interpretation

Should be zero. Any value above that is both a security and a cost issue, because orphaned accounts are often still being paid for.

## IT Governance and Compliance

[Go to the field](/en/it-beratung/it-governance-und-recht)

### Coverage of the register of obligations

Formula

Number of obligations with a named owner and available evidence divided by the number of recorded obligations, times 100

Unit

Percent

Interpretation

Shows how audit ready you are. Evidence produced only when an audit arrives does not count.

### Share of classified AI applications

Formula

Number of AI applications with a documented risk classification divided by the number of recorded AI applications, times 100

Unit

Percent

Interpretation

The basis for all duties under the AI Act. AI features that arrived with a new version of existing software have to be recorded too.

### Licence deviation

Formula

Number of licences in use minus the number of licences purchased, divided by the number purchased, times 100

Unit

Percent

Interpretation

Positive values mean exposure to back claims, negative values mean permanently excessive cost. Determine per product and per counting method, and do not forget indirect usage.

### Share of tracked contract deadlines

Formula

Number of contracts with a recorded notice period and reminder divided by the number of active IT contracts, times 100

Unit

Percent

Interpretation

Determines whether you can negotiate or only renew. Reminders should fire at least one month before the notice period expires.

Rt

Written by

[Redaktion techport.ai](/ueber-uns), IT-Beratung

Mehr als 15 Jahre Erfahrung in IT-Projekten des Mittelstands, Auswahl und Einführung von Unternehmenssoftware, Aufbau von IT-Betrieb und Informationssicherheit in wachsenden Organisationen.

[More about us](/en/ueber-uns)

More from techport.ai

[

Software

Custom process software for mid-sized companies.

](/en/loesungen)[

HR consulting

People processes and the systems behind them.

](/en/hr-beratung)[

IT maturity check

Ten minutes to a clear position.

](/en/it-beratung/reifegrad-check)[

HR maturity check

24 statements, a result per field.

](/en/hr-beratung/reifegrad-check)[

Funding

BAFA grant plus more than 50 programmes for delivery.

](/en/foerderung)[

Process in practice

How workflows become reliable software.

](/en/sop-praxis)[

Data and AI

Analysis, forecasts and assistance systems.

](/en/daten-ki)[

About us

The people behind techport.ai.

](/en/ueber-uns)
